MODE: CAD_HOLOGRAM_CYAN
CAM [X:+18.5 Y:+11.2 Z:+24.0] • FOV 42°
ACTIVE PHASE 01 // CLICK TO PLANS
SCROLL 3D 0%
SEQ 00–30% // HOLOGRAPHIC CAD MODE

Aerospace-Grade Structural Engineering.

MIR Engineering Services Inc unifies pre-engineered Click to Plans master drawings, ASCE 7-22 structural FEA design, and PE-certified field inspections across 45+ US states.

700+
Master Plans
45+
PE Licensed States
185 MPH
HVHZ Certified
< 48h
Digital PE Stamp
PHASE 01 // CLICK TO PLANS (0% – 30%) CAD HOLOGRAM

America's Fastest Building Plan Store.

Watch parametric dimensions draft live across the holographic frame: we standardize building component engineering (hurricane shutters, bioclimatic pergolas, base-shoe railings, storefronts & HVAC curbs) into instant, permit-ready master plans.

SHUTTERS
+120/-130 PSF
PERGOLAS
175 MPH ADM
HVAC CURB
ASCE 7 CH.29
ExpressPass Dispatch: 24–48 Hours Open Catalog Now
PHASE 02 // STRUCTURAL DESIGN FEA (31% – 65%) STRESS HEATMAP

Finite Element Stress & Hurricane Wind Heatmap.

CAD vectors extrude into solid steel and concrete beams. We isolate every critical node under HVHZ hurricane wind gusts (ASCE 7-22, Florida Building Code 8th Ed., IBC 2024) to optimize high-suction corner vortices.

LIVE FEA STRESS SCALE D/C RATIO
GREEN: Rational Span (0.45) AMBER: Collectors (0.78) RED: Corner Vortex (0.94)
MANUFACTURER SYSTEMIZATION // TER & NOA

3-Phase Discovery Process: Concept to State Product Approval.

01
Introductory Discovery & Feasibility (4 Hours)

Extrusion & profile engineering scoping call with licensed PE, optimized lab test matrix, and fixed fee quote.

02
CAD & Calculation Engineering Templates

Parametric EXOps systemization allowing nationwide dealers to generate anchors without engineering delays.

03
TER Reports, FBC & Miami-Dade NOA

ISO/IEC 17025 accredited laboratory test witnessing (TAS 201-203) and multi-state PE stamped approvals.

PHASE 03 // TECHNICAL INSPECTIONS (66% – 100%) LASER SCAN ACTIVE

Technical Field Inspections, Laser Telemetry & Audits.

The structure transitions into solid architectural reality under our volumetric laser sweep. We execute Threshold structural audits, Florida 40/50-year Milestone recertifications, chemical anchor pull-out tests, and PE forensic reports.

AWS D1.1 / ULTRASONIC
Structural steel weld & bolted moment connection audits.
ACI 318 / PULL-OUT
Non-destructive rebar scanning & Hilti/Simpson pull testing.
MIR EXOPS // EXPRESSPASS PERMITTING PIPELINE

From Laser Scan to Approved Building Permit.

Scroll down into our operational workbench to purchase and download instant master plans in Click to Plans or compute live ASCE 7-22 wind pressures and schedule an engineering inspection.

TRANSACTIONAL PLATFORM // INSTANT PURCHASE & DOWNLOAD

Click to Plans: Permit-Ready Master Plans.

ASCE 7-22 COMPUTATION SUITE & CORPORATE BOOKING

Load Calculators & Instant Quote Estimator.

Basic Wind Speed V (mph) 175 mph
Mean Roof Height h (ft) 35 ft
Effective Wind Area (sq ft) 20 sq ft
Exposure
Risk Category
VELOCITY PRESSURE (qz)
65.5 PSF 3.14 kPa
CORNER C&C DESIGN PRESSURE (ZONE 5)
+77.3 / -103.5 PSF
Kz: 1.01 | Kd: 0.85 | Exp: C | Risk: II
HIGH RISK / HVHZ: Requires heavy-wall 6061-T6 aluminum mullions and Hilti HIT-HY 200 epoxy anchors.
FAST SCHEDULER & PE FEE ESTIMATOR

Quote Design or Inspection

ESTIMATED BASE $1,450 USD
KNOWLEDGE BASE // BUILDING CODES • FBC • IBC • ASCE 7-22

Technical Resource Center & FAQs

System Synchronized